2011
Lake Johnson
Raleigh, NC
In 2011, Vertical Walls was contracted to install the ACB (Articulated Concrete Block) Matting for the City of Raleigh Lake Johnson Dam Revetment project. A tropical storm caused the undermining of the dam spillway. Installing ACB Matting allows the dam embankment to withstand overtopping. The installation of this type of slope stabilization is one the largest of its kind in the Nation. We were able to complete this project in just a few short months for the City of Raleigh.
Case Study Link: http://www.conteches.com/knowledge-center/case-studies/case-study-details/articleid/734/lake-johnson-dam-overtopping-protection
Project Details
100,000 sqft
ACB Matting
ArmorFlex 40 Tapered